Cabinet fan T1 T2

03/01/26
Tower 1 
L1 Cabinet fan 3 core 4 sq
1 26m. Com
2 26m. Com
3 33m com

1 38m com
2 31m com
3 27m com
4 22m com
5 32m com
Escalator Side
1. 16m com

Tower 2
1. 16m com
Other Room
1.63m com
2.59m com
3.54m com
Totally - 443m

06/01/26
Cabinet Fan L1
3c 4sq
1. 8m com
2.8m com
3.8m com
4.7m com
5.7m com

Popular posts from this blog

OLD CABLE MAGERMENT

S1 DB -4 R1 - 32 done Y2 - 43 M. Done Y3 - 19 m done R4 - 31 m done B5 53 done Y6 - 66 done B7 - 51 done Y9 - 100 M Done B8 - 99 M Done Y10 - 79. Done R 11 75 M done  Total 648 M S1 BD-2 R5 - 15M ok R8- 43M ok R9 - 50M ok B7 52M ok B6 36M ok B2 71M ok R3 79M ok  B4 86M ok B1 95 M ok Total 527 M S1 DB -3 Y2 - 13 m ok Y4 - 50 m ok Y3 - 53m ok R1 - 75m ok Looping DB Arif Sir 📌 S3   Arif Sir achinta kaku S3 looping  16m 14m 35m 13m 40m 📌 Looping Db - 2 Y 5 - 15 m 📌 DB - 3 R2-y2 - 34m ok R5 - y5 -15 m ok R3 - B3 - 31m ok 📌 DB - 4 R1 - Y1 - 38 m R2 - Y2 - 22m Y1 - B1 - 33m Y2 - B2 - 17m Y3 - R3 - B3 25 m R4 - Y4 L B4 20m  Y6 -13m R7 - 25 m B2 Z3 FM EA 169 170 171 (6) 2 pic Complete  B2 Z2 JET F3 DB 3 right side  185+4 =189 186+4 =190 187+4 = 191 ( 6) 2 pic Complite B2 Z4 Fm Ea 158 159 161 (6) 2 pic Complete B1 Z5 6 core 2.5 sq 1done 2 done 3 done  Z5 5no - 48m Z5 4 no - 30 m Z5 6no - 43 m Z5 7no - 62 m Complete Tower 2 3c 4 sq No 1...

DEC CABLE MAGERMENT

S1 New Dec- 24 S1 to B2 102 m 185sq Z4 138m - 4 Core 1.5 sensor B1 - 85m. 4core25 sq B2 New magerment 4 core 1.5 Completed sensor Z3. 07 - 85m ok Z3 - 08-114 cut Z3 - 09 135 cut Z3 - 10 154m cut  Z4-01-138 done Z4 - 04 - 77 okk Z4 - 05 complete  Z4 - 06 64m okk Z4 -07 - 84 okk Z4,08 115m okk Z4 - 09 - 152m okk done Z5,01 - 110 Z5,02 - 84 Z5,03- 65 Z5,04 57 Z5,05- 39 Z5,06- 63  Z5,07- 70  Z5,-08 102 okk done Z6,01- 91 ok Z6,02- 68 ok Z6 - 03- 48m ok Z6- 04 -66m  Z6 -05 - 85m ok Z6-06 -  107m ok done Complete 

22/12/2025 to 26/12/2025

4 Core 95 SQ Cable From S3 To S1 Electric Room . No1-135 and 80 m from 215m Com No2- 114 and 62 m from 176m Com B2   DB Main 95sqto Db5- 80 Com DB Main 95sq to DB8- 62 Com DB Main 50sq to DB 9 - 33 com DB Main 95sq to DB 10 - 91 com DB Main 50sq to DB 12 - 65 com DB Main 96sq to DB7 - 47m com DB Main 95sq to DB 10 changes 95sq to 50sq- 91 m.  Car Chargeing   MAIN DB TO DB 2 - 57M done MAIN DB TO DB 3 - 47M 95sq done MAIN DB TO DB 4 - 90m com MAIN DB TO DB 4 - 90m Cutting From 162m 25/12/2025 S3 - 4 CORE 25 SQ MAIN pn1  MAIN db to DB 3 - 69 M com DB 4 - 21M com S1   Ele room to main db185 sq - 156m com B2   DB3 -25SQ- 22M com DB6 - 95SQ- 30M com DB9-50SQ- 33M com S3 25 sq 21m com 25 sq 64m com Totally= 416 m Tower 3 Car Main S2 -185sq - 77m done  B2- 185sq - 110m done 3 core 4 sq exl fan El Room - 61M Total= 242 M