B2 Zet Fan 16/01/26

B2 Zet Fan 16/01/26 6c 2.5 sq Z1- 01 - 87m Done Z1 - 02- 59m Done Z1 - 03 - 29m Done Z1- 04 - 44m Done Z1 - 05 - 78 m done Z1 - 06 - 96m done Z1 - 07 - 109m done Z1 - 08 - 122 m done Z1 - 09 - 146m done Total - 758 m done Z2 -01 - 87m com Z2 - 02 - 57m Com Z2 - 03- 30 m Com Z2 - 04 -43 m Com Z2 - 05 - 70m Com Z2- 06 - 118 m com Z2 - 07 - 114m Com Z2 08 - 128 m com Z2 - 09 - 127m com Z2 - 10 - 144m com Total= 889m "Z3 - 01 already  Z2 - 02 already  Z3 - 03 already  Z3- 04 58m. Com Z3-05 already  Z3- 06 - 68m Com Z3 - 07 - 99m com Z3 - 08 - 120m Z3 - 104 m Total= 345m Z4 - 06 - 104 Com Z4 - 05 - 87m  Total= 151m Z5 - 06- Confusion Z5 - 07 -66 m pending  Total=58 Z6 - 03 - 62 M already  Z6- 01 - 62 M already  Z6 02- 36M alredy  Z6- 04 already  B2 New magerment 6 core 2.5 Zet Fan Z1 - 4 no - 28 m. Done Z1 - 5 no - 60m done Z1 - 6 no - 87m. Done Z1 - 7 no - 126m done Z1 - 8 no -125m. Done Z1 - 9 no -140m. Done Z2 - 11 no- 165 m right. Done...

OLD DATA

25/12/2025 S3- 4 CORE 25 SQ MAIN pn1  MAIN db to DB 3 - 69 M com DB 4 - 21M com S1  Ele room to main db185 sq - 156m com B2  DB3 -25SQ- 22M com DB6 - 95SQ- 30M com DB9-50SQ- 33M com S3 25 sq 21m com 25 sq 64m com Totally= 416 m 27/12/25 S1 -cable 3core 4sq  Zone 5 Exl Fan Elc Room - 116m done Sub DB - 3 car 50 sq 75m done  Dg Upper Light 4 core 2.5 cable -  1st light to last light- 120m done  Last light to Main 38m done Emergency lights 4 c 2.5 sq Light 1 - 17m done Light 2 - 8m done Star case light - 79m done Totally - 453m  Sathish sir 3 core 4 sq  136m Anu sir 2 core 1.5 sq Tower 3 and 2 main panel South Rhs /Lhs North ---- Rhs North /Lhs South. Only Room Wall 22m 2core 1.5 taris cable Tower 3 - Star case 110m done Star case110m done 85m star case 2 done 62m Star case 1 done Totally - 367 Tower 2- 47 2 core 2.5 sq Star case - 130 Star case - 130 St 2 - 260m St 1- 182m Totally - 702 Tower 1- 49 wall last Star case - 130 Star case - 130...

Tower 2 Smoke eater

Tower 2 Smoke eater  4 core 1.5 or 2.5 No 1 1- 70m pending  2- 70m pending  No 2 1-70m pending  2-70m pending  B2 Exl fan Done 3core 4/6 sq No 2 92 M B1  Exl fan Done 3core 4/6 sq Z1- 97 S2 Main Incomeer 95sq Cable  DB3 Incomeer left side 66m pending  DB2 Incomeer right side 100m pending 

T1 and T3- Teris Smoke Eater

Teris Smoke Eater T1- 07/01/26  Cable 4c 1.5 Smoke Eater 1- 25m Smoke Eater 2- 90m Big Fan - 1- 60m Big Fan -2 - 104m Signal Light - 35m Totally - 314 M Tower 3Taris   14/01/26 Smoke earter taris tower 3 4 core 1.5  No1 Smoke Eater 1- 98 M Smoke Eater 2 - 98 M No 2 - No 1 - 51 M No 2 - 60 M Signal Light - 56 M Totally - 365 M Completed

Cabinet fan T1 T2

03/01/26 Tower 1  L1 Cabinet fan 3 core 4 sq 1 26m. Com 2 26m. Com 3 33m com 1 38m com 2 31m com 3 27m com 4 22m com 5 32m com Escalator Side 1. 16m com Tower 2 1. 16m com Other Room 1.63m com 2.59m com 3.54m com Totally - 443m 06/01/26 Cabinet Fan L1 3c 4sq 1. 8m com 2.8m com 3.8m com 4.7m com 5.7m com

B1 Car Charging DB

5 CORE 4 SQ Car Cable  Dec 27 to Dec 31  SDB1 R1 - 24m done R2 - 18m done R3 - 37m done B4 - 43m done R5 - 10m done R6 - 23m done R7 - 30m done  R8 - 39m done R9-48m done R10-63m done R11-76m done SDB-2 R1-36m done Y2- 24m done B3- 14m done R4- 12m done R5- 20m done R6 - 26m done R7 - 41m done R8 - 51m done R9 - 65m done R10 - 54m done R11 - 23m done SDB3 DB3 R11- 70m done DB3 R10-61 m done DB3 R09-53m done DB3 R08-44m done DB3 R07-36m done DB3 R06-26m done DB3 R05-20m done DB3 R04- 20 done  DB3 R03-32 done  DB3 R02-42 done  DB3 R01-50 done

22/12/2025 to 26/12/2025

4 Core 95 SQ Cable From S3 To S1 Electric Room . No1-135 and 80 m from 215m Com No2- 114 and 62 m from 176m Com B2   DB Main 95sqto Db5- 80 Com DB Main 95sq to DB8- 62 Com DB Main 50sq to DB 9 - 33 com DB Main 95sq to DB 10 - 91 com DB Main 50sq to DB 12 - 65 com DB Main 96sq to DB7 - 47m com DB Main 95sq to DB 10 changes 95sq to 50sq- 91 m.  Car Chargeing   MAIN DB TO DB 2 - 57M done MAIN DB TO DB 3 - 47M 95sq done MAIN DB TO DB 4 - 90m com MAIN DB TO DB 4 - 90m Cutting From 162m 25/12/2025 S3 - 4 CORE 25 SQ MAIN pn1  MAIN db to DB 3 - 69 M com DB 4 - 21M com S1   Ele room to main db185 sq - 156m com B2   DB3 -25SQ- 22M com DB6 - 95SQ- 30M com DB9-50SQ- 33M com S3 25 sq 21m com 25 sq 64m com Totally= 416 m Tower 3 Car Main S2 -185sq - 77m done  B2- 185sq - 110m done 3 core 4 sq exl fan El Room - 61M Total= 242 M