B2 Zet Fan 16/01/26

B2 Zet Fan 16/01/26 6c 2.5 sq Z1- 01 - 87m Done Z1 - 02- 59m Done Z1 - 03 - 29m Done Z1- 04 - 44m Done Z1 - 05 - 78 m done Z1 - 06 - 96m done Z1 - 07 - 109m done Z1 - 08 - 122 m done Z1 - 09 - 146m done Total - 758 m done Z2 -01 - 87m com Z2 - 02 - 57m Com Z2 - 03- 30 m Com Z2 - 04 -43 m Com Z2 - 05 - 70m Com Z2- 06 - 118 m com Z2 - 07 - 114m Com Z2 08 - 128 m com Z2 - 09 - 127m com Z2 - 10 - 144m com Total= 889m "Z3 - 01 already  Z2 - 02 already  Z3 - 03 already  Z3- 04 58m. Com Z3-05 already  Z3- 06 - 68m Com Z3 - 07 - 99m com Z3 - 08 - 120m Z3 - 104 m Total= 345m Z4 - 06 - 104 Com Z4 - 05 - 87m  Total= 151m Z5 - 06- Confusion Z5 - 07 -66 m pending  Total=58 Z6 - 03 - 62 M already  Z6- 01 - 62 M already  Z6 02- 36M alredy  Z6- 04 already  B2 New magerment 6 core 2.5 Zet Fan Z1 - 4 no - 28 m. Done Z1 - 5 no - 60m done Z1 - 6 no - 87m. Done Z1 - 7 no - 126m done Z1 - 8 no -125m. Done Z1 - 9 no -140m. Done Z2 - 11 no- 165 m right. Done...

OLD DATA

25/12/2025 S3- 4 CORE 25 SQ MAIN pn1  MAIN db to DB 3 - 69 M com DB 4 - 21M com S1  Ele room to main db185 sq - 156m com B2  DB3 -25SQ- 22M com DB6 - 95SQ- 30M com DB9-50SQ- 33M com S3 25 sq 21m com 25 sq 64m com Totally= 416 m 27/12/25 S1 -cable 3core 4sq  Zone 5 Exl Fan Elc Room - 116m done Sub DB - 3 car 50 sq 75m done  Dg Upper Light 4 core 2.5 cable -  1st light to last light- 120m done  Last light to Main 38m done Emergency lights 4 c 2.5 sq Light 1 - 17m done Light 2 - 8m done Star case light - 79m done Totally - 453m  Sathish sir 3 core 4 sq  136m Anu sir 2 core 1.5 sq Tower 3 and 2 main panel South Rhs /Lhs North ---- Rhs North /Lhs South. Only Room Wall 22m 2core 1.5 taris cable Tower 3 - Star case 110m done Star case110m done 85m star case 2 done 62m Star case 1 done Totally - 367 Tower 2- 47 2 core 2.5 sq Star case - 130 Star case - 130 St 2 - 260m St 1- 182m Totally - 702 Tower 1- 49 wall last Star case - 130 Star case - 130...

Tower 2 Smoke eater

Tower 2 Smoke eater  4 core 1.5 or 2.5 No 1 1- 70m pending  2- 70m pending  No 2 1-70m pending  2-70m pending  B2 Exl fan Done 3core 4/6 sq No 2 92 M B1  Exl fan Done 3core 4/6 sq Z1- 97 S2 Main Incomeer 95sq Cable  DB3 Incomeer left side 66m pending  DB2 Incomeer right side 100m pending